Princeton University

Solar West Garage

Solar Phase 1,2,3

Since 2021, Circadia has managed the installation of 8 solar array sites as a part of the Solar Phase One Program. Our services included oversight of the contractor, coordination with the local public utility and townships, development of individual project

Read The Case Study
f6

Campus Energy Conservation Program

Circadia Group managed the inaugural phase of Princeton University’s campus-wide LED conversion, a critical initiative supporting the University’s mission to reduce carbon emissions to 1990 levels. This multi-year effort focused on transitioning legacy lamp and ballast systems to high-efficiency LED

Read The Case Study
Princeton Ai Hub 32

NJ AI Hub Accelerator Lighting Design

In collaboration with Janisak Biddle Architects, J+M Engineering, and Irvin and Leighton General Contractors, Circadia Group was engaged by Princeton University to design and commission the lighting and lighting controls for the NJ AI Hub Accelerator headquarters in West Windsor,

Read The Case Study
Cover

The Point Lighting Upgrade

In 2021, Circadia Group was engaged by Princeton University to provide lighting design support to the project architect (Janisak Biddle) for the development of The Point, a new Transportation and Student Services space. Circadia’s scope included the selection and specification

Read The Case Study
Lab Image 1

Research Laboratory Renovations

Circadia Group has managed a portfolio of multiple lab renovations for PI’s, including design and construction management. This involved comprehensive coordination and management of specialized laboratory and mechanical equipment. Collaboration with Laboratory Animal Resources (LAR) was a critical aspect of

Read The Case Study
Classrooms Cover

Classroom Refreshes

Circadia Group was engaged to provide lighting specification and installation support for the annual classroom refresh program. As part of the renovations replacing carpets, furniture, and paint, lighting and lighting controls were updated with added control through the new AV

Read The Case Study
Substation 02

69kV Substation

Princeton University upgraded its electrical power capacity by building a new 69kV substation in West Windsor, New Jersey. The University needed more capacity and reliable power to support 3M square feet of new buildings planned within the current capital plan.

Read The Case Study